UPS Installation Configuration and Setup

Name: UPS Installation Configuration and Setup

Client: Methodist Ladies College

Owner: Methodist Ladies College

Site Location: Resource Centre

Completed: December 2014

Personnel:
Project Manager: Matthew Harris
Site Supervisor: Ian Pinkard

Special Project Achievements:
The UPS installation was completed after hours and energised within the required time frame.

Quality Standards Applicable:
AS/NZS 3080:2013
AS/ACIF S009:2013

Specific OH & S Requirements:
AS/NZS 3012:2010

 

 

The Methodist Ladies’ College (MLC) is an independent, Uniting Church, day and boarding school for girls, located in Claremont.

The School has an aim to have all devices online with 10gig throughput 24 hours a day, 7 days a week.

MLC worked with Lightspeed Communications to implement a DR centre with a large enough capacity to survive electrical disruption in order to achieve their 10gig goal.

Lightspeed Communications, together with MLC, calculated the workloads to some 20+ remote communication cabinets equipment and provided a solution for UPS capacity, in order to provide up time on essential services throughout the school.