Replacement of Existing UPS 6KVA
Name: Replacement of Existing UPS 6KVA
Client: Cape Australia
Owner: Cape Australia
Site Location: Level 17, 216 St Georges Terrace
Completed: September 2017
Personnel:
Project Manager: Matthew Harris
Site Supervisor: Darren Bertolini
Special Project Achievements:
The UPS installation was completed and energised within the required time frame.
Quality Standards Applicable:
AS/NZS 3080:2013
AS/ACIF S009:2013
Specific OH & S Requirements:
AS/NZS 3012:2010
Cape Australia is an international leader in the provision of critical industrial services, principally to the energy and natural resources sectors.
Lightspeed Communications were engaged to supply and install a UPS 6KVA for their main server rack located in their Perth office.
Lightspeed Communications were able to accommodate the client with a weekend installation, so that downtime to the customer was minimized.