New Office Fit out
Name: New Office Fit Out
Client: Sulzer Pumps
Owner: Sulzer Pumps
Site Location: Wangara
Completed:
2014/2015
Personnel:
Project Supervisor – Joseph Arrigo
Site Supervisor – Ryan Sommerfeld
Special Project Achievements:
Works completed on time and under budget.
Quality Standards Applicable:
AS/NZS 3080:2013
AS/ACIF S009:2013
Specific OH & S Requirements:
AS/NZS 3012:2010
Sulzer is one of the world’s leading pump manufacturers. Sulzer’s manufacturing footprint encompasses more than 20 sites and their network of service centres and sales offices spans around the globe. Sulzer are well known for state-of-the-art products, performance reliability, and energy-efficient solutions.
Lightspeed Communications was engaged to install data cabling at Sulzer Pumps new tenancy at 52 Discovery Way, Wangara.
These works included the installation of catinery wire for cable pathways in the ceiling space and a cable tray for the pathway from Level 1 to bring the site in line with Australian cabling standards. Lightspeed installed Krone Cat6 cabling to all data outlet locations from the customer’s communications rack, which upgraded the site from the existing Cat5e cabling to a Category 6 Gigabyte platform. Lightspeed also installed cabling to mid office desks via service poles to soft wire outlets in the basket tray work beneath the desks.
All cabling was terminated on Krone Category 6 Patch panels and installed within a new 42RU full height rack.
Lightspeed used a Level III Fluke DTX1800 copper tester. To test all outlets to Gigabyte thresholds and meet all Aus/NZ PL Class E (AS/NZS 3080:2013 & AS/ACIF S009:2013) standard.