Infrastructure Upgrades At Arup
Name: Arup Level 12 Fitout
Client: Arup
Owner: Arup
Site Location: Level 12 Exchange Tower
Completed: 2016
Personnel:
Project Manager: Joseph Arrigo
Site Supervisor: Ian Pinkard
Special Project Achievements:
Project completed on time and within budget
Quality Standards Applicable:
AS/NZS 3080:2013
AS/ACIF S009:2013
Specific OH & S Requirements:
AS/NZS 3012:2010
Arup are a global firm of consulting engineers, designers, planners and consultants.
Building requirements recently forced a site move of their Perth offices. Lightspeed were engaged to do various infrastructure upgrades as well as project manage contractors completing works.
The works varied from auditing and installing structured cabling, electrical upgrades, manufacture and installation of new walls and joinery for the reception area, security access changes for BMS and door control and reactivation of VESDA for the communications room.
The scope of works moved and changed constantly with Lightspeed working closely with Arup to ensure all changes were smooth and hassle free.
All works were completed within budget and time frame for the move to take place