Design & Consultancy At Fremantle Port
Client: Patricks Terminal
Owner: Patricks Terminal
Site Location: Fremantle
Completed: 2013
Personnel:
General Manager: Matthew Harris
Operations Manager: Ian Pinkard
Special Project Achievements:
All work completed within the deadline, more works completed within the original budget outlined..
Quality Standards Applicable:
AS/NZS:3080:2013
AS/ACIF S009:2013
Specific OH & S Requirements:
AS/NZS 3012:2010

With the upcoming redevelopment of Patricks Fremantle Wharf, Lightspeed was involved in the consultancy of the redevelopment project.
The main challenge of this was how to keep a 24/7 Billion Dollar operation ongoing without any down time. This was achieved through the auditing and documentation of the existing communications network and designing a new single mode network to be installed in parallel.
These works where under taken over a period of multiple months and included installation of over 8 thousand metres of single mode optical fibre and many hundreds of terminations.
Installation of this cable will allow for the automation of the Patricks Terminal allowing data throughout areas such as mobile cranes, the new developed administration buildings, Power Sub Stations and multiple lighting towers allowing, site- wide CCT network and future wireless data network to be available throughout the site.